
RTS17A
POWER
REOUIREMENT
1 1sVAC
60
Hz
oPERATTNG
AMPS.
(MAX)
o.o
REFRTGERANT CHARGE
R-12(02)
5.U
coMPRESSoR
0rL GHARGE
(02)
8.5
COMPRE$SOR
690
BTU
CABINET
LINER
HIGH IMPACT
LAMINATED
POLYSTYRENE
DOOR
LINERS
HIGH
IMPACT
LAMINATED
POLYSTYRENE
FOUNTAIN HEATER
Ohms
Watts
NONE
CABINET
INSULATION
FOAM
TEMPERATURE CONTROL
(At
Normal)
Cut-Out
(Plus
or
Minus 1.5"F)
Cut-ln
(Plus
or
Minus 1.SoF)
+
230F
+
330F
CONDENSER
FAN
COOLED
CAPILLARY
TUBE
Length
Diameter
5.5
ft.
.026" LD
DEFROST
THERMOSTAT
Cut-Out
(Plus
or
minus
6'F)
Cut-ln
(Plus
or
minus
6"F)
+
47"F
+
150F
DEFROST
TIMER
Defrost
Cycle
Defrost
Time
AFTER
COMPRESSOR
FUNS 6
HRS,
(rorAL)
21
MtN.
DEFROST HEATER
Ohms
Watts
31
400
DEFRoST
AMPS.
(MAX.)
DIVIDER CHANNEL
HEATER
Ohms
Watts
'1323
10
PERFORMANCE
TEST DATA
The laboratory
test data in
this chart
was
obtained
under
the following
conditions:
(1)
power
source
of 115V
AC,60 Hz,
(2)
no door openings,
(3)
no
load,
(4)
customer
control(s)
set at
mid-point, The
pressures
and
wattages shown
were taken:
(a)
during
a
normal
running cycle,
(b)
with
treezer temperature
near OoF
(ref
rigerator
temperature,
if applicable,
near
*38oF),
(c)
no
sooner
than 5
minutes
after
compressor
start-up.
In the home,
measurements
will vary depending
upon environmental
and
usage
conditions.
70"F
(Ambient)
90"F
(Ambient)
1100F
(Ambient)
oh
Operating
Time
KWH|?
Hours
Suction
Pressure
(psig)
High Side
Pressure
(psig)
Running Watts
30-40
1.6-2.0
0-3
1 00-1 20
1
65-200
55-70
2.5-3.3
0-3
1
30-1
50
165-210
100
3.8-4.9
o-4
140-170
1 5s-200
9-3
-
Refrigerator
1
-
Service
1
-
INTRODUCTION
3
-
:l ; lrl
5
-
CAPACITY
6
-
COMPANYO
7
-
Newton
7
-
INSTRUCTIONS
8
-
UNCRATING
9
-
LOCATION
9
-
"rorrrut
10
-
LEVELING
11
-
REVERSING
12
-
DOOR REMOVAL
16
-
OPERATION
17
-
Side-By-Side
18
-
PROCEDURES
21
-
-r'
22
-
SIDE-BY-SIDE
23
-
DISPERSING
24
-
CHECKING
25
-
OPERATIOT\f
25
-
(A'
25
-
LEAK TESTING
27
-
TESTING
28
-
CHECKING PRESSURES
30
-
EVACUATING
32
-
AND RECHARGING
32
-
RECHARGING
33
-
'Q':fr-fr
34
-
COMPRESSOR INOPERATIVE
35
-
PROCEDURE
36
-
WITH COMPRESSOR
36
-
OPERATIVT
36
-
COMPRESSOR
38
-
INOPERATIVE
38
-
REPLACING THE COMPRESSOR
42
-
1/2 inch
43
-
EXCHANGER
44
-
1/2" lrom the end of
45
-
CONDEJVSER
48
-
REPLACING
49
-
CONDENSER
49
-
FREEZER
51
-
EVAPORATOR
51
-
ELECTRICAL
55
-
OVERLOAD
56
-
PROTECTOR
56
-
STARTING
57
-
CAPACITOR
58
-
ALTERNATE METHOD
59
-
USING OHMMETER
59
-
REMOTE READING THERMOMETER
60
-
REPLACING THE
61
-
,,:',*
63
-
ALTITUDE
64
-
ADJUSTMENTS
64
-
DEFROST
65
-
DEFROST TIMER
66
-
Wtlte,r
67
-
DEFROST HEATER
68
-
AND THERMOSTAT
68
-
DEFROST HEATER AND
70
-
THERMOSTAT
70
-
REPLACING RADIANT
71
-
THE FREEZER
75
-
DTVIDER
76
-
CHANNEL
76
-
CABINET
77
-
I'
78
-
REFRIGERATED
79
-
DRAIN TUBES
82
-
STYROFOAM
83
-
ASSOCIATED
85
-
DOOR PANEL
86
-
ALIGNMENT
90
-
Union Connection
93
-
RESERVOIR
94
-
FOANTAIN
96
-
ASSEMBLY
96
-
ACTUATOR
97
-
INTERLOCK
100
-
DISASSEMBLING ICE
100
-
STORAGE BIN
100
-
AUGER MOTOR
101
-
SECTION
102
-
INSTALLATION
102
-
FILL TUBE
103
-
Side-By-Side Models
107
-
PREPARING FREEZER
107
-
INSTALLING
108
-
WATER VALVE
108
-
AND CONNECTING TUBING
108
-
CONNECTING
109
-
ICE MAKER
109
-
TO WATER SUPPLY
109
-
.'ERVICING
111
-
COMPONENTS
113
-
ADJUSTMENT
114
-
TEMPERATURE
115
-
SHUT OFF ARM
116
-
SERVICE
116
-
OTHER INFORMATION
118
-
SPECIFICATIONS
118
-
SHOOTING
119
-
POSSIBLE
120
-
POSSIBLE CAUSE
121
-
TROUBLE POSSIBLE CAUSE REMEDY
122
-
POSSIBLE CAUSE REMEDY
124
-
SCHEMATICS
126
-
L-_i:gt'r__io.'#@*s
127
-
,,,.de
128
-
'17
129
-
,:;*qmffi^
130
-
'-i--rW--io:g@u*
131
-
D'.de
132
-
,,.de,RTDlg
133
-
,,.de,RTD2l/
134
-
Mode,RTW2"
135
-
,,.de,RTD23
136
-
,
137
-
,,.de,RSD20
138
-
,L.de,RSD22A
139
-
_ sry_
140
-
,,.de,RSD24A
141
-
{Y-''t
142
-
PERFORMANCE
144
-
TEST DATA
145
Kommentare zu diesen Handbüchern